This document provides specific guidance on implementing Stage 3 of the suggested PRTR design process. For each of the main features of the PRTR system to be designed by the NCT, the guide introduces key decisions that need to be taken and provides references to other documents where additional information can be found. A complete listing of the documents referred to throughout the text are provided in Annex I.